铁道部通信网重点改造工程——兰新复线通信网改造工程,于1996年8月17日零点全线割接,正式投入铁路通信网运行.兰新复线沿线十几个点,绵延近千公里,全线从C2至C5局均采用深圳华为公司生产的C&C08数字程控交换机,设备总容量达34000线.其中做为C2局的乌鲁木齐铁路局装机容量达10000用户线,近2000路中继.铁道部兰新复线验收小组于1996年7月10~19日进行了为期10天的复验,以铁标作为验收标准,按铁标7号、铁标1号进行了全面、严格的测试.复验结果,铁道部正式同意华为公司设备进入铁路网使用.
Ministry of Railways communications network key renovation project - Lanxin double-line communications network renovation project, at zero on August 17, 1996 cut across the board, formally put into operation the railway communications network.Lanxin Double Line along a dozen points, stretching nearly 1,000 kilometers, The entire line from C2 to C5 Bureau of Shenzhen C & C08 digital program-controlled switches produced by Huawei, with a total capacity of 34,000 lines .Among them as Bureau C2 Urumqi Railway Bureau installed capacity of 10,000 subscriber lines, nearly 2000 trunks. The new multi-line inspection team conducted a 10-day retest on July 10-19, 1996, and conducted a comprehensive and rigorous test on the basis of the iron standard as the acceptance standard according to Tiebiao No. 7 and Tiebiao No. 1. The results of the retest Ministry of Railways formally agreed to use Huawei equipment to enter the railway network.