T形尾墩消力池在小型工程上的运用

来源 :农田水利与小水电 | 被引量 : 0次 | 上传用户:crazyapple123
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
我县小型水库溢洪道消力池的设计,过去大多采用底流消能。为了使水跃提前发生,并产生一定的淹没,消力池必须有足够的长度和深度。一般消力池长度较长,工程量大,很不经济。湖南三江口电站和印度的布哈伐尼电站,经过大量的试验工作,采用了T形尾墩消能工,无负压现象,使池长减少,收到良好的效果。 In our county, the design of small reservoir spillway stilling pool was mostly used in the past to dissipate energy. In order to make the water jump ahead of time, and produce a certain submergence, the pool must have sufficient length and depth. General consumption pool longer, large amount of engineering, it is not economical. Hunan Sanjiangkou Power Plant and India’s Bukhavalini Power Station, through a large number of experimental work, the use of T-shaped tail pier energy dissipater, no negative pressure, the pool length reduced, and received good results.
其他文献
一、概况南宁市临江街堤防工程位于郁江下游邕江河段南宁市中心的邕江大桥北岸,上自临江街街口起,下至中山路尾(街道)止,全长共588m(见图1),是临江街大道的防洪及护岸工程,
天平始终是公正的──湛江商检局对一批进口异丙醇变色原因的鉴定纪实胡小云,宋武元去年7月,一艘由荷兰鹿特丹港装载异丙醇的“坦普拉”号远洋巨轮,抵达湛江港。货主报验后,湛江商
(Name LISts withoutorder of Priority)MinistryOfForeignTradeandEeonomieCooPerationState General AdministrationofCUstomSState Administration ofPress and Publleati
第1期·基础地质· 新疆库车盆地古迪克组的地层时代和沉积环境………………………………………………………关绍曾关世桥(1) 与翡翠相似的玉石“不倒翁”的矿物学研究………
出口针织品染色问题应引起重视徐美花,李先锋最近,金华商检局对6家针织品出口企业的产品染色情况进行了抽样检查,共抽取6批18个色位,经理化测试,其中4批13个色位不合格,批次不合格率为66.7%,色位
本文基于数理统计分析及灰色系统理论的建模思想,对长江葛洲坝围堰横向水平位移的观测资料进行了整理与分析,并建立了数学回归模式及预报系统。成果表明,围堰的水平位移将趋
根据城乡建设环境保护部的要求,由中国市政工程东北设计院会同陕西省综合勘察院、上海勘察院等单位编写的《城市供水水文地质勘察规范》于一九八六年十一月在深圳审查通过。
水泥土以士为主,掺入少量水泥及适量的水,经均匀拌和、压实硬化而成,是一种新型的建筑材料。桐乡县水利农机局及省水科所针对杭嘉湖地区缺乏砂石等原料,砌石的混凝土护坡又
生产输液(血)器应遵照国际标准蔡兆宏,孟红弟近年来我国生产出口一次性使用无菌输液器、输血器产品越来越多。仅吉林省1993--1995年间出口近54批次,1亿套(支),总值达1194万美元,产品远销美国、俄罗斯、
海南粮食走向市场的思考陈萍江泽民总书记在党的十四届五中全会讲话中指出:“充分发挥市场机制的作用和加强宏观调控,都是建立社会主义市场经济体制的基本要求,二者缺一不可”。