我公司二工区第四和第一施工队,积极采用大模板施工新工艺,去年10月底完成了两幢11000多平方米十层住宅的地下部份,11月中旬开始进入结构施工,分别于今年3月和4月完成结构。全部结构工程基本上都是冬季施工,共浇灌混凝土近3000立方米.采用了蒸汽热模养护法,初步摸索出一些大模板冬季施工经验,现
The second and fourth construction teams of our company’s second working area actively adopted new construction techniques. At the end of October last year, the underground parts of two ten-story residential buildings with a total area of more than 11,000 square meters were completed. Construction began in mid-November this year. The structure was completed in March and April. All structural engineering is basically winter construction. A total of nearly 3,000 cubic meters of concrete has been poured into the concrete. Using the steam hot mold curing method, some large forms of winter construction experience have been tentatively explored.