论文部分内容阅读
全江一九五五年上半年实际完成年度计划的百分之一七·六,为上半年计划的百分之五○·八九,情况如下: 甲、基本建设计划完成情况:根据水利部转国家计划委员会批准下达计划数字进行检查,实际仅完成上半年计划的百分之三七·九四;全年计划的百分之一一·九七。由於大多数单位未能完成计划,不仅积压了国家大量建设资金,而且加重了我会下半年的工作任务。上半年未能完成计划的主要原因有以下几方面: —、由於设计工作抓得不紧,影响工前准备,以致不能按时开工者占全部未完成计划的百分之八五,仅洪湖隔堤堵口工程未能按计划开工即占百分之八二·三。该工程属於临时防汛措施,我会於一九五四年
The actual completion of the annual plan for the first half of 1959 in the first half of 1855 was 50.99% for the first half of the year. The situation is as follows: A. The completion of the capital construction plan: According to the Ministry of Water Resources Turning to the State Planning Commission to approve the release of planned figures for inspection, only 37% of the plan for the first half of the year was actually completed; the annual plan was 11%. Since most of the units failed to complete the plan, not only did the country backlog a large amount of funds for construction, but it also aggravated the tasks of the second half of the year. The main reasons for the failure to complete the plan in the first half of the year were as follows: — Due to the lack of design work and the impact on pre-work preparations, the failure to start work on time accounted for 85 per cent of all uncompleted projects, only the Hong Kong Bank. The blocking project failed to start as planned and accounted for 8.2%. The project is a temporary flood prevention measure. I will be in 1954