无平衡重转体施工在大跨径拱桥上的应用

来源 :科技信息(科学教研) | 被引量 : 0次 | 上传用户:a123458a
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
无平衡重转体采用锚固体系代替平衡重平转法施工,充分利用了锚固体系、转动体系和位控体系构成了平衡的转体系统,适用于大跨径或转体重量大的拱桥。转体分为整体转体和上、下游拱箱分别转体,整体转体系桥将拱圈分为两半跨同步转体合拢;上、下游分箱转体系上、下游拱箱分别同步转体合拢。本文对无平衡重转体施工在大跨径拱桥上的应用技术进行了总结。 The unbalanced re-rotating body adopts the anchoring system instead of the counterbalanced swivel construction to make full use of the anchoring system, the rotating system and the position control system to form a balanced swivel system, which is suitable for an arch bridge with a large span or a large swivel weight. Swivel is divided into the overall swivel and the upper and lower arch boxes were swivel, the overall system of the bridge to turn the arch ring is divided into two halves cross synchronous swivel closed; on the downstream box system, the downstream arch box were synchronized swivel close. This article summarizes the application techniques of unbalanced re-swivel construction on long-span arch bridge.
其他文献
物流管理软件在我国市场具有巨大的应用前景,作者结合ERP系统的原理提出第三方物流管理软件的系统流程、系统模型,并介绍了系统的主要功能模块及系统的实现方案.
此项目的目的是通过区域所有功能的集成分析改善纤维喂入系统的设计,最终减少加工中的问题.产品稳定性得到改善,同时机器和纤维喂入系统的效率得到提高.装载效率和生产能力限
电网建设的发展,实现不停电跨越架线势在必行。传统的做法是由施工单位架设跨越架和防护网进行跨越架线施工。对传统做法存在的难度用事实进行剖析,可以了解到,对不停电跨越
当前,我国国企掀起了一阵导入学习型组织的热潮。本文主要分析了国企学习型组织的现状,并探讨了国企导入学习型组织的创新与实践,提出了一些创新对策。
造成档案工作从业人员“职业倦怠”的诱发因素相当复杂:既有个人因素、又有社会因素、还有二者共同作用的因素。归纳起来主要有:一、个人理想需求与社会满足之间的差距档案工
通过检测到的心脏磁场强度数据对心脏建立源模型,求解模型参数有助于研究心脏电活动,对心脏疾病的临场诊断和医学研究具有极大的价值,提出一种心脏磁场等效单磁偶极子源求解
非英语专业的学生在英语发音方面相对于本专业的学生而言总是要相对欠缺一些.大部分的学生都或多或少地存在英语语音问题.在分析其原因之后提出了相应的一些有利于教师纠正学
目的:观察泄浊饮对湿热内阻型2型糖尿病伴高尿酸血症患者早期肾功能的影响.方法:将60例符合诊断标准的患者随机分为治疗组和对照组,均行糖尿病降糖西药基础治疗,治疗组加用泄
每一个施工企业都把工程项目的最优质量、最低成本、最佳工期作为奋斗目标.成本控制是项目管理中非常重要的内容.文章叙述如何分解成本总目标、成本动态控制的具体做法.
随着综合化机械采煤技术在煤矿中的广泛运用,对解决矿井地质问题的要求也越来越高.基于三维地震勘探自身的诸多优势,目前它已成为解决煤矿地质问题的重要勘探手段.