建设高标准条田承泄区和排水骨干系统的治理,仅仅为农田排水创造条件,但是,农田排水的真正解决,还取决于田间工程,也就是要建设高标准条田。标准条田工程的作用标准条田工程应起到下列调节作用: 1.根据一定降雨频率,能按要求时间排除田面积水。例如根据盘锦气象资料分析,按十年一遇标准,旱田三日内连续降雨198.9毫米,雨后三
The construction of a high standard of the drainage area and the drainage of key management system, only to create conditions for drainage of farmland, but the real solution to farmland drainage, but also depends on the field project, that is, to build a high standard field. The standard strip works the role of the standard strip works should play the following regulatory role: 1. According to a certain rainfall frequency, can be excluded from the required time field water. For example, according to Panjin meteorological data analysis, according to the standard once every 10 years, dry land within three days of continuous rainfall of 198.9 mm, after the rain three