【摘 要】
:
2015年4月29日,太行国宾馆柏坡厅,省政协十一届十二次常委会议在这里举行。依照惯例,每位常委及列席人员的会议材料当中,都会有两本省政协办公厅印发的大会发言合订本,一本是
论文部分内容阅读
2015年4月29日,太行国宾馆柏坡厅,省政协十一届十二次常委会议在这里举行。依照惯例,每位常委及列席人员的会议材料当中,都会有两本省政协办公厅印发的大会发言合订本,一本是口头发言,一本是书面发言。“可能是女同志的缘故,我明显感觉这次会议材料很沉,猜想会有其他什么重要会议文件,打开资料袋才发现,没什么不同,只是发言材料比以往厚了
April 29, 2015, Taihang State Guesthouse Parker Hall, Provincial CPPCC eleven sessions held here. Traditionally, each member of the Standing Committee and the attending members of the conference materials, there will be two copies of the General Assembly speech issued by the provincial CPPCC speech, one is an oral statement, one is a written statement. ”May be a lesbian, I obviously felt the meeting was heavy material, guess what other important meeting documents, open the bag found, no different, but the speech material thicker than ever before
其他文献
With the wide application of electron linear accelerator(E-linac)in various fields,the autonomous research and optimization of electron linear accelerator have
On November 17,the CIAE,together with five other partners including the China Aerospace Science and Industry Corporation,carried out the first physical experime
In work places such as the fuel cycle and nuclear facilities decommissioning,the aerosol inhalation is inevitable for workers.Some transuranic elements in aeros
作为中国对外开放战略的最新版图,“一带一路”是中国迈向世界并与世界互动的重要路径,其战略核心是多边跨界合作共同体2015年4月30日,共走丝绸之路活动暨共好百国使节庆祝联
The electromagnetic isotope separator EMIS-170 is constructed based on the early domestic F-3isotope separator,and the 280 t electromagnet is still used.The mai
In-core temperature control and monitoring is a critical process in a nuclear reactor.Thermocouple based on temperature measurement is one of the techniques sui
采用表面喷丸处理和两次连接方法获得不锈钢/Cu-镁合金连接接头。采用万能试验机测试焊接接头的拉伸强度,采用扫描电镜及自带能谱仪观察连接接头显微组织及元素分布,采用显微
On September 28,the comprehensive technological renovation of the CIAE~’s electromagnetic isotopeseparator passed the acceptance check organized by the State A
We had mainly carried on the debugging and commissioning of CYCIAE-100 for HI-13 Tandem Accelerator Upgrade Project in 2016.The installation and commissioning o
1 Information of operation and production Operation person:Present chief operators are 6 persons,operators are 3 persons;new chief operators is 0person,new oper