Prediction of Debris-flow Danger Area by Combining Hydrological and Inundation Simulation Methods

来源 :Journal of Mountain Science | 被引量 : 0次 | 上传用户:huai0407
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Debris flows have caused serious human casualties and economic losses in the regions strongly affected by the Ms8.0 Wenchuan earthquake of 2008. Debris flow mitigation and risk assessment is a key issue for reconstruction.The existing methods of inundation simulation are based on historical disasters and have no power of prediction.The rain-flood method can not yield detailed flow hydrograph and does not meet the need of inundation simulation. In this paper,the process of water flow was studied by using the Arc-SCS model combined with hydraulic method,and then the debris flow runoff process was calculated using the empirical formula combining the result from Arc-SCS.The peak discharge and runoff duration served as input of inundation simulation. Then,the dangerous area is predicted using kinematic wave method and Manning equation.Taking the debris flow in Huashiban gully in Beichuan County,Sichuan Province,China on 24 Sep.2008 as example,the peak discharge of water flow and debris flow were calculated as 35.52 m3·s-1 and 215.66 m3·s-,with error of 4.15%compared to the measured values.The simulated area of debris-flow deposition was 161,500 m2,vs.the measured area of 144,097 m2,in error of 81.75%.The simulated maximum depth was 12.3 m,consistent with the real maximum depth between 10 and 15 m according to the field survey.The minor error is mainly due to the flow impact on buildings and variations in cross-section configuration.The present methodology can be applied to predict debris flow magnitude and evaluate its risk in other watersheds inthe earthquake area. Debris flows have caused serious human casualties and economic losses in the regions strongly affected by the Ms 8.0 Wenchuan earthquake of 2008. Debris flow mitigation and risk assessment is a key issue for reconstruction. The existing methods of inundation simulation are based on historical disasters and have no power of prediction. The rain-flood method can not yield a detailed flow hydrograph and does not meet the need of inundation simulation. In this paper, the process of water flow was studied by using the Arc-SCS model combined with hydraulic method, and then the debris flow runoff process was calculated using the empirical formula combining the result from Arc-SCS. peak discharge and runoff duration served as input of inundation simulation. Then, the dangerous area is predicted using kinematic wave method and Manning equation. the debris flow in Huashiban gully in Beichuan County, Sichuan Province, China on 24 Sep.2008 as example, the peak discharge of water flow and debris flow were calculated as 35.52 m3 · s-1 and 215.66 m3 · s-, with an error of 4.15% compared to the measured values. The simulated area of ​​debris-flow deposition was 161,500 m2, vs. the measured area of ​​144,097 m2, in error of 81.75%. The simulated maximum depth was 12.3 m, consistent with the real maximum depth between 10 and 15 m according to the field survey. Minor error is mainly due to the flow impact on buildings and variations in cross-section configuration. present methodology can be applied to prediction debris flow magnitude and evaluate its risk in other watersheds inthe earthquake area.
其他文献
患者女,42岁,因左眼被刀刺伤3小时,于1992年10月27日下午4点急诊入院。患者于入院当日1人在家,下午1点,一歹徒闯入患者家中抢劫,患者随即与之搏斗不幸被歹徒用尖刀刺伤左眼,同时预部
大都会歌剧院2月份上演的《拉美摩尔的露契亚》本应是该演出季的亮点,这不仅是俄国辣妹安娜·涅特里布科(Anna Netrebko)与墨西哥金童罗兰多·维拉宗(Rolando Villaz(?)n)这
高职教育主要培养学生的某种职业技能,然而若只培养技能而忽视素质教育,则学生只能是一项技术的容器而不可以称之为合格的人,因此显现出高职院校进行素质教育的重要性。本文
在高速公路线路设计中,为了适应不同的地形条件,常常用较多缓和曲线连接,这些缓和曲线连接方式多种多样,有正向、反向,有完整型和半截型等,它们的坐标计算有时比较复杂,需要
虽然鼠类已广泛用于眼科实验性炎症反应的研究,但鼠眼对中性化学刺激的反应尚无人探讨。为了证实局部化学刺激对鼠眼血-房水屏障的影响,作者取白色Spraque-Dawley雄鼠,先对
天然地震后续PmP震相的射线路径两次穿越地壳内部,能够极大地提高射线的交叉和覆盖程度,对改善地壳内部结构的成像精度具有重要作用.本文首先对不同震源深度的天然地震后续Pm
山东维尔斯化工有限公司建设的碳酸二甲酯(DMC)联合装置,年产2.5万吨碳酸二甲酯、3万吨碳酸丙烯酯和1,2-丙二醇,自2008年12月一次开车成功后,一直稳定运行。碳酸二甲酯为国际
根据全国安全生产电视电话会议、全国安全生产工作会议精神和《国家安全监管总局2009年工作要点》,2009年安全生产应急管理工作总的要求是:以科学发展观为统领,坚持安全发展
在隧道建设中对隧道的施工质量进行全面系统的动态检测监控,能确保隧道的施工质量达到设计的要求。本文以南方某公路在隧道建设中通过地质雷达对隧道支护结构如层厚度、钢支
好友轮胎有限公司为满足出口和国内轮胎产品结构调整的要求,研发了12R22.5GF766无内胎轮胎。该轮胎胎冠宽度较大,胎冠弧度高度较小,轮胎的耐磨性能好;胎肩部位两侧采用圆周防