主体工程合同总价承包项目是更好地完成合同内主体工程项目的重要条件和有效保证。通过对主体工程合同总价承包项目的特点和变更支付方法的分析,结合锦屏一级水电站,提出了主体工程合同总价承包项目计量支付控制措施,并进行了效果分析。分析表明,锦屏一级水电站主体工程合同总价承包项目相关计量支付控制措施的设置,对主体工程的顺利实施及工程投资控制均起到了积极作用。
The contract price of the main project contract is an important condition and an effective guarantee to better accomplish the main project in the contract. Through the analysis of the features of the total contracting project of the main project contract and the changing payment method, combined with the Jinping I hydropower station, the measure control measures of the total contract price of the main project contract were proposed and the effect analysis was carried out. The analysis shows that the setting of relevant measurement and payment control measures for the total contract price of the main project of Jinping I Hydropower Station has played a positive role in the smooth implementation of the main project and the project investment control.