高砂水电厂1号机组自投产以来,就一直存在定子铁芯松动和定子运行温度高等先天不足的严重缺陷,发电机定子虽经多次局部修复和大修,运行条件有所改善,但由于未能对定子做结构性的改造,至今温度高、铁芯松动等问题仍未能彻底解决。给高电公司经营带来了很大的影响,2007年下半年利用1号机组扩大性大修机会对1号发电机定子进行结构性改造,达到了预期目的,提高了1号发电机运行的可靠性。文中从1号发电机投入运行以来存在的问题、改造的技术措施、改造方案的确定、发电机定子技术改造过程和技术改造后的效果分析等几方面简述了1号发电机定子改造情况。
Since the high-sand power plant Unit 1 has been put into operation, there has been a serious shortage of stator core loosening and high stator operation temperature. Although the generator stator has undergone several partial repairs and overhauls, operating conditions have been improved. However, Stator made structural transformation, so far high temperature, iron core loose and other issues are still not completely solved. To high-power companies have a great impact on the operation, the second half of 2007, the use of Unit 1 expansion overhaul opportunities on the 1st generator stator structural transformation, to achieve the desired goal, to improve the reliability of the 1st generator Sex. This paper briefly introduces the problems existing in the operation of generator No.1, the technical measures of the reconstruction, the determination of the reconstruction scheme, the technological transformation of the generator stator and the effect analysis after the technological transformation.