论文部分内容阅读
过油管碳氧比能谱测井施工相对裸眼井测井和固井质量评价测井来说,是一种相对复杂的、存在较高风险的施工作业。确保人员、设备、井场的安全是整个作业过程中非常重要的一环。本文介绍了过油管碳氧比能谱测井施工工艺,并对一些可能发生的施工风险,提出了建议和对策。
Cross-section tubing C / O logging is a relatively complex and relatively risky construction operation relative to open-hole logging and cementing quality evaluation logging. Ensuring the safety of people, equipment and well sites is a very important part of the entire operation. This paper introduces the logging technology of C / O ratio logging in oil pipeline and puts forward suggestions and countermeasures for some possible construction risks.