武义县宣平溪二级电站的调节水库分别在干、支流上各建一座水库组成,称为母、子库,两库用隧洞连通,由母库通过压力隧洞引水发电。为选择连通库设计中的最优方案,利用 BASIC 语言,编制了武义县宣平溪二级电站连通库设计中有关水文水能计算的11个程序(见下表),均适用于 PC—1500机。本文只介绍其中三个比较常用的水能计算程序。
The regulating reservoirs of the XuanPingXi II hydropower station in Wuyi County are respectively composed of a reservoir on the stem and tributaries, called mother and sub-reservoirs, and the two reservoirs are connected by tunnels, and the mother reservoirs are led to generate electricity through pressure tunnels. In order to choose the optimal scheme in the design of connectivity library, 11 programs (see table below) about hydrology and water energy calculation in the design of the connectivity reservoir of XuanPingXi Ⅱ hydropower station in Wuyi County were prepared by using BASIC language. All of them are suitable for PC-1500 machine. This article describes only three of the more commonly used water energy calculation program.