铜锣山隧道属于重庆市轨鼓通6号线的二期工程,双线隧道,单洞全长5630m,其中地质条件复杂,穿越煤层、瓦斯、岩溶发育带、石膏岩、断层带和都市生活密集区,地质有软有硬,传统单一的TBM掘进机不能满足施工要求,为此从美国罗宾斯公司引进了复合式TBM。复合式TBM整合了硬岩掘进机与盾构机的优点,适应地层更加广泛。在铜锣山隧道施工过程中,复合式TBM配件材料达2000多种,如何进行设备配件及材料的成本控制,是一项全过程高效配合、有计划的工作。
The Tongluo Mountain Tunnel belongs to the second phase of the project on the 6th line of the Kuangtong Pass in Chongqing. The double-track tunnel has a single hole of 5630m in total length. The geological conditions are complex and it crosses the coal seam, gas and karst development zone, gypsum rock, fault zone and urban life Dense areas, geology with soft and hard, the traditional single TBM boring machine can not meet the construction requirements, for this reason from the United States introduced Robbins composite TBM. Combined TBM combines the advantages of TBM and TBM to adapt to a wider range of formations. During the construction of the tunnel in Tongluo Mountain, there are more than 2,000 compound TBM parts and materials. How to control the cost of equipment parts and materials is a highly efficient and planned work in the whole process.