论文部分内容阅读
3月25-26日,国家防总副总指挥、水利部部长陈雷率由水利部太湖流域防汛抗旱检查组,检查指导江苏省防汛防旱准备情况。省长李学勇会见陈雷一行,并与陈雷共同检查了无锡犊山防洪工程。陈雷表示,江苏省委省政府高度重视,水利工程防御能力不断得到提升,抗旱应急调水能力显著,防汛抗旱基础工作不断夯实,
From March 25 to March 26, Chen Lei, the deputy commander-in-chief and director of the Ministry of Water Resources, under the supervision of the flood control and drought relief inspection team of the Taihu Lake Basin, Ministry of Water Resources, inspected and prepared for flood control and drought relief in Jiangsu Province. Governor Li Xueyong met with Chen Lei and his entourage and checked with Chen Lei the Wuxi Du Mountain flood control project. Chen Lei said that the Jiangsu provincial party committee and government attach great importance to the continual improvement of the water conservancy project’s defense capabilities, and the capability of emergency response and water diversion is remarkable. The basic work of flood control and drought relief has been continuously consolidated.