【摘 要】
:
甘肃省甘南藏族自治州装机容量最大的水电站———迭部达拉河口水电站开工建设.达拉河口水电站是迭部县通过招商引资建设的第一座电站,位于迭部县城东南30km处,坝高67m,总库
论文部分内容阅读
甘肃省甘南藏族自治州装机容量最大的水电站———迭部达拉河口水电站开工建设.达拉河口水电站是迭部县通过招商引资建设的第一座电站,位于迭部县城东南30km处,坝高67m,总库容1506万m3,装机容量5.25万kW,年发电量2.73亿kW·h,工程总投资3.7亿元.迭部县水能资源丰富,蕴藏量总共
Gannan Tibetan Autonomous Prefecture in Gansu Province, the largest installed capacity of hydropower station --- Diebu Dalahekou hydropower station construction .Dalakou hydropower station is Diebu County through investment attraction construction of the first power station, located in Diebu county 30km southeast of the dam height 67m, with a total capacity of 15.06 million m3, an installed capacity of 52500kW, an annual generating capacity of 273 million kW · h and a total investment of 370 million yuan. Diebu County is rich in hydropower resources with a total amount of reserves
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
2014年全世界消耗水泥约42亿吨,混凝土超过200亿吨,是地球上消耗最多的材料。按每吨普通硅酸盐熟料(简称PC熟料)产生的CO_2为810kg计算,CO_2排放总量约30亿吨。近些年来,为降
《水资源保护》是由环境水利研究会与河海大学共同主办的,以技术性为主,兼顾学术性和管理性的技术性期刊。本刊1985年创刊,是全国惟一的水资源保护方面的专业性期刊。国内外
国外某咨询公司对水泥回转窑生产操作控制提出如下看法,情况如下:rn回转窑是一台倾斜的长圆柱体回转装备,窑内生料加热煅烧后转变为熟料.生产操作需稳定的烧成带和窑皮,稳定
放疗是治疗癌症的有效手段之一,然而各种肿瘤甚至同种肿瘤的不同病人其疗效却有很大差异,其中重要的影响因素就是肿瘤细胞的辐射敏感性.如果能在放疗前预知其敏感性的高低,则可大大地改善放疗方案的制定和决策,从而有针对性的提高各个病人的疗效.目前,常用低剂量照射后的细胞存活率(如SF2)判断辐射敏感性[1],但这种方法需要的时间较长,而且活检细胞体外培养不易成功,直接影响患者的及时治疗.因此越来越多的学者开
2015年联合国气候变化大会于11月30日~12月11日在法国巴黎召开,讨论有关气体变化及排放,各国应该承担什么样的责任,开展什么样的行动来应对气候变化(INDCs).目前已有155个国家
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
对连续5年单产超过7t/667m2的超高产纽荷尔脐橙园进行调查分析。结果表明,其土壤肥力好,有机质含量较高,绝大多数土壤矿质营养元素含量达到或超过正常水平;叶片氮、磷、钾和
1 存在的问题rn我公司于2009年对原有两条2 000 t/d熟料生产线进行技术改造,计划技改项目于2011年6月完成并投入生产.技改后原熟料生产线产能达到2500t/d,最高达到了3 100t/d