论文部分内容阅读
简述了颍上船闸工程概况,裂缝情况及原因,并着重介绍了裂缝处理方案及裂缝的预防措施。实施后效果良好,为同类工程施工提供了可借鉴的经验和方法。
The general situation of Yingshang Ship Lock Project, the situation of cracks and reasons are briefly described. The crack treatment scheme and the prevention measures of cracks are emphatically introduced. After the implementation of good results for the construction of similar projects can provide lessons learned and methods.