1984年,我局在郑州黄河公路大桥下部基桩施工时,从日本引进了两台砼输送泵和6辆配套的6m~3搅拌输送车,并从郑州购置了两台15m~3/h砼搅拌楼,为泵送砼的机械化施工创造了条件。自此以后,在郑州、开封、淮滨、漯河等公路大桥的施工中都采用了泵送砼灌注桩孔、接基桩立柱、打桥台墩帽、打大桥桥面,泵送砼达10万m~3之多,施工速度快,质量高,这些工程都被评为我省的优质工程。现将淮滨淮河公路大桥施工中采用集中搅拌、机车搅拌输送、泵送砼灌注桩孔的机械化施工情况介绍如下,该桥基桩共107根,直径2.2m、深60多m,每根桩砼
In 1984, during the construction of the lower pile of Zhengzhou Yellow River Highway Bridge, the Bureau introduced two helium transmission pumps and six matching 6m~3 mixing conveyors from Japan, and purchased two 15m~3/h units from Zhengzhou. The mixing tower creates conditions for the mechanical construction of pumping concrete. Since then, in the construction of highway bridges in Zhengzhou, Kaifeng, Huaibin, and Luohe rivers, pumping boreholes have been used for pumping, piles of piles have been piled up, bridge caps have been hit, bridge decks have been bridged, and pumping has reached 10 As many as 10,000 m3, construction speed, high quality, these projects have been rated as high-quality projects in our province. The mechanization of the construction of the Huaihe River Highway Bridge using concentrated agitation, mixing and conveying by locomotives, and pumping of pile bores is described below. There are 107 piles of piles with a diameter of 2.2m and a depth of more than 60m each.砼