论文部分内容阅读
福仁山隧道是中国水电十四局承建的西成铁路西安至江油段(陕西境内)站前工程XCZQ-5标段的一座典型隧道工程。该隧道地处秦岭南麓低中山区,位于商丹断裂带和勉略-巴山弧形断裂构造带夹持的南秦岭构造带,内部组成与构造变形十分复杂,工程地质现象较为特殊,具有一定的研究意义。
Furen Hill Tunnel is a typical tunnel project of the XCZQ-5 section of the station project of Xi’an-Jiangyou section (within Shaanxi Province) of the Xicheng Railway under construction undertaken by China Hydropower Bureau14. The tunnel is located in the low-mid-mountain area of the south foot of Qinling Mountains and is located in the southern Qinling structural belt that is sandwiched between the Shangdan fault zone and the Mianlou-Bashan arc fracture zone. The internal composition and tectonic deformation are very complicated and the engineering geological phenomenon is rather special. Research significance.