三峡工程二期厂房与大坝混凝土施工管理信息系统于2000年5月27日通过验收并交付使用。该系统由中国水力发电工程学会新技术研究中心承担开发任务。该系统通过建立厂坝的三维体型、2万块混凝土浇筑块分层分块信息库及混凝土分块属性库,利用三维图形交互系统,实现三维空间实体造
Three Gorges Project Phase II plant and dam concrete construction management information system on May 27, 2000 through the acceptance and delivery. The system by the China Hydropower Engineering Institute of New Technology Research Center to undertake development tasks. The system through the establishment of factory dam three-dimensional shape, 20,000 concrete pouring block layered block information database and concrete block attribute database, the use of three-dimensional graphics interactive system to achieve three-dimensional space entity