前言为了了解丹江口大坝在施工期间的质量,监测大坝在蓄水过程中和运行期间的工作状态,验证大坝设计假定与实际工作状态的相符程度,为改进同类型建筑物的设计提供资料,根据坝址地质情况和建筑物结构特点,在该坝9~11、21、26~28、31、33等代表性坝段的坝基和坝体内部埋设观测仪器。所埋仪器的种类和数量见表1。
Preface In order to understand the quality of Danjiangkou Dam during construction, monitor the working status of the dam during water storage and operation, verify the conformity between dam design assumptions and actual working conditions, and provide information for improving the design of the same type of buildings According to the geological conditions of the dam site and the structural features of the building, observation instruments are embedded in the dam foundation and the dam body of the representative dam sections 9 to 11, 21, 26 to 28, 31, 33 and so on. The type and number of instruments buried in Table 1.