论文部分内容阅读
葡萄牙西北部装机191.6 MW的新文达Ⅱ抽水蓄能工程即将完工,该工程将对提高卡瓦杜河、拉巴高河和奥门河上8座水电站的运行效率发挥重要作用。阐述了工程的设计和施工特点。
The completion of the construction of a new Hydropower Station, Phase II, with an installed capacity of 191.6 MW in northwestern Portugal, will play an important role in enhancing the operating efficiency of eight hydropower stations on the Cava Dou, Rabacao and Omen rivers. Elaborated the project design and construction characteristics.