论文部分内容阅读
在抗御去年6月29日至7月11日(以下简称“91·7”)的特大暴雨中,我省水利工程发挥了巨大作用,但也暴露了不少问题。灾后,我们就水利存在的问题、原因及今后的对策,进行了比较全面的调查与研究。建国以来,我省水利建设成绩显著,初步形成以小型为基础、大中型为骨干、大中小型相结合的防洪、排涝、灌溉三大工程体系,大大增强了抗御水旱灾害的能力。在抗御“91·7”特大暴雨中,泵站提排涝水220多亿立方米,为1700多万亩受涝农田及时
In the torrential rains against June 29, 2001 to July 11 (hereinafter referred to as “91 · 7”), the province’s water conservancy project has played a huge role, but it also exposed many problems. After the disaster, we conducted a more comprehensive investigation and study on the existing problems of water conservancy, the reasons and future measures. Since the founding of the People’s Republic of China, our province has made remarkable achievements in water conservancy construction, initially forming a three-project system of flood control, drainage and irrigation that is based on small size, large and medium-sized backbone, and small, medium and large size, greatly enhancing its ability to resist floods and droughts. In the resounding “91 · 7” torrential rains, the pumping station raised more than 220 billion cubic meters of waterlogging, more than 1700 acres of flooded farmland in time