论文部分内容阅读
围绕西南医院科教影像楼增层改建工程的设计 ,在肯定了大跨预应力框架应用于该类工程中的优越性的同时 ,指出了该预应力框架设计中存在的问题。最后 ,针对框架柱弯矩偏大的问题提出了具体的解决办法。
Focusing on the design of the reconstruction project of science and education imaging building in Southwest Hospital, the design of the prestressed frame design is pointed out while affirming the superiority of the long-span prestressed frame in this kind of engineering. Finally, a concrete solution is put forward to solve the problem that the moment of frame column is too large.