由于北京铁路枢纽西黄线增建二线工程,北京西站新增八~十站台和17~20股4股到发线。因此需拆除北京西站南侧的现有发送和中转行包库、行李托取厅及货棚。该行包库承担着北京西站接发全国各地的行包快递,影响范围很广。根据行李包裹量统计资料的计算,到近期,规划的行包到达、发送、中转量以及行李包裹量的大幅增加,使得既有行包库的面积已不能满足规划需要,行包库扩建工程迫在眉睫。站内除站台和股道用地外无其他多余用地,因用地条件受到限制,行包库改扩建设计方案考虑为地下方案,扩建范围位于北京西站八~十站台和17~20股道下方,拟建规模为地下一层局部二层,地上新建三层行李托取办公楼,行李托取办公房屋在既有的行李托取房屋拆除后的基础上进行建设,目前北京西站地下行包库已经改建完成,经验收并投入使用。
Due to the additional second-line construction of the West Yellow Line of Beijing Railway Terminal, Beijing West Railway Station added eight to ten stations and 17 to 20 4-to-extension lines. Therefore, it is necessary to dismantle the existing sending and transit package repositories, baggage claim halls and freight sheds to the south of Beijing West Railway Station. The bank library bear Beijing West Railway Station received the parcel express delivery across the country, affecting a wide range. According to the calculation of baggage statistics, the planned arrival, delivery, transit and baggage packages have increased dramatically in the near future, making it impossible for the area of existing baggage and parcels to meet the planning needs and the imminent expansion of the project package . In addition to station site outside the site and no extra land, due to restricted land conditions, the line package library expansion project to consider the underground expansion program, the scope of expansion is located in Beijing West Railway Station eight to ten stations and 17 to 20 shares below the proposed Build scale for the first basement of the second floor of the ground floor of the new three-tier baggage office building, baggage take office building in the existing luggage after the removal of housing construction on the basis of the current Beijing West Railway Station underground package has been Reconstruction completed, experience and put into use.