在太平湾水电站建设过程中,我局始终注意择优选取施工方案,提高施工技术水平;同时采取有效措施加强质量管理,确保工程质量,从而为该电站顺利通过启动阶段验收、较原计划提前一年发电创造了有利条件。下面仅就这两方面的工作情况做一简要介绍。
During the construction of Taiping Bay Hydropower Station, our bureau always pays attention to choose the construction plan optimally and improves the technical level of construction. At the same time, effective measures are taken to strengthen the quality management and ensure the quality of the project so that the power station can pass the check-in stage of the start-up one year earlier than originally planned Power generation has created favorable conditions. The following is only a brief introduction of these two aspects of the work.