辽宁地区除南端滨海一带外,每年有5个月(头年11月至次年3月末)皆系冬季,而6月下旬至8月上旬两个月期间内又系雨季。以往施工情况是4月间下工地,5月间正式开工,干了一个多月就到雨季,工程基本上停顿;到8月末继续施工,再干一个多月就进入冬季了。这样,实际可以顺利施工的日期每年不到5个月,形成小半年施工大半年闲,一年任务压缩在很短期限内完成,往往形成突击赶工,招致浪费。 1954年起,我们开始注意到了冬季施工的问题,当年修建的抚松松花江桥11孔豪式木桁架,上部安装就是在冬季完成的。以后冬季施工工程量逐年有所增长,由零星工程而至整段路线,由小桥涵而至大桥,逐步摸索和积累了一些经验,也增加了信心。1957年冬全面展开了冬季施工。 1955年修盘山桥时,由于冬季施工在冰面上打桩,克服了深水施工困难,节省了大量支架和脚手架;墩基
In addition to the southern tip of Liaoning coastal area, each of five months (the first year of November to the end of March next year) are all winter, and late June to early August within two months of another rainy season. In the past, the construction was under construction in April and officially started in May. After more than a month in the rainy season, the construction basically stopped. By the end of August, construction was continued, and more than a month was left to enter the winter. In this way, the actual construction date can be less than 5 months each year, forming a small half-year construction half idle, a year to complete the task within a very short period of compression, often form a surprise attack, resulting in waste. Beginning in 1954, we began to notice the problem of winter construction. The 11-hole hovel-type wooden truss of the Fusong Songhuajiang Bridge built in that year was completed in the winter. After the winter construction project volume increased year by year, from the sporadic project to the entire route from the bridge and culvert to the bridge, and gradually explore and accumulate some experience, but also increase the confidence. The winter of 1957 fully launched the winter construction. In 1955, at Panshan Bridge, piling on the ice due to winter construction overcame the difficulties of deep-water construction and saved a great deal of scaffolds and scaffolds.