某建筑工程的建筑主体完工后,在进行接地电阻测试中发现接地电阻不符合规范要求,在防雷工程施工过程中应加强对管理、工序和环节的重视,根据实际情况提出了防止失误措施及具体做法。具体做法为:提高管理,避免出现漏洞;接地体联结;掌握好联结焊接要点和操作规范要点;加强管理,完善岗位制度。对施工前的准备工作、工艺流程、操作要点进行了系统分析,指出了在防雷工程施工时应注意的事项,以确保正确施工。
After the construction of a construction project is completed, it is found that the grounding resistance does not meet the specifications in the grounding resistance test. During the construction of the lightning protection project, attention should be paid to the management, procedures and links. Based on the actual situation, the measures to prevent the fault and specific methods. The specific practices are: to improve management, to avoid loopholes; grounding connection; master the key elements of joint welding and operational practices points; strengthen management, improve the job system. The preparatory work before the construction, process flow, the main points of the operation of a systematic analysis, pointed out that the mine construction should pay attention to matters to ensure the correct construction.