论文部分内容阅读
过去国内空调,冷、热风一般都在集中的空调机房内处理而得,然后通过送风管送入室内,并通过回风管抽回机房,重新进行处理。这样势必有庞大的送风管、回风管,并需要为数不少的空调机房。随着毛主席的革命外交路线不断取得胜利,高层建筑和外事建筑任务正日益增长。高层建筑的空调给我们提出了新的课题,原有的集中式空调系统已不能适应新的要求。
In the past, domestic air-conditioning, cold and hot air were generally processed in a centralized air-conditioning room, and then sent into the room through the air-supply pipe, and were returned to the engine room through the return air pipe to be reprocessed. This is bound to have a huge air supply pipe, return air pipe, and a lot of air conditioning room. With the continuous victory of Chairman Mao’s revolutionary diplomatic route, the tasks of high-rise buildings and foreign affairs construction are increasing. The air conditioning of high-rise buildings has brought us new issues. The original centralized air-conditioning system can no longer meet the new requirements.