【摘要】科学的质量控制体系,对于不断提高工程质量,满足客户对工程项目的质量要求起到举足轻重的作用。顺利运行质量控制体系对于打响企业知名度,建立企业的质量管理制度具有重大影响。质量控制管理符合可持续发展战略思想,能够体现和谐社会的要求。结合本人工作实践,本文从模板施工与混凝土施工的质量保护上谈谈自己的看法。
【关键词】房屋建筑;模板施工;混凝土;质量保护
【Abstract】Scientific quality control system, to continuously improve the quality of the project, to meet customer quality requirements of the project played a pivotal role. Quality control system for smooth operation started their visibility, the establishment of enterprise quality management system has a significant impact. Quality control management in line with the sustainable development of strategic thinking, able to reflect the requirements of a harmonious society. Combined with my working practice, this paper talk about their views on the quality of protection from Formwork and concrete construction.
【Key words】Quality protection;Concrete;Formwork;Housing construction
近年来,随着房屋建筑需求量增大,房屋建筑工程建设迅速发展,施工质量问题越来越突出,最近时间频发的工程质量事故给房屋建筑工程敲响了警钟,必须加强房屋建筑工程质量控制,提升房屋建筑工程的质量。在房屋建筑的市场竞争中,质量越来越成为工程项目的标签,质量将成为占领市场份额的最有利武器。加强施工质量控制,提升工程项目质量首先熟悉施工质量控制的内容,这样才能够针对不同过程,对症下药,科学有效地控制施工质量。本文从模板施工与混凝土质量保护上谈谈自己的观点。
1. 模板施工质量保证措施
1.1主控项目。
模板的安装:当确保下层楼板具有一定承载力时,再进行上层模板及支架搭设工作。检查数量:全部进行检查。检验方法:依据模板设计文件和模板的施工技术方案。对模板刷隔离剂过程中,保证钢筋和混凝土接搓处干净。检查数量:全部进行检查。检验方法:操作中观察。模板的拆除:底层模板及其支架拆卸之前达到足够的强度;对于设计没有无具体要求时,保证混凝土强度相关的规定。检验方法:检查相同养护条件下试件强度的试验报告。
1.2一般项目。
模板的安装:按下列规定的要求进行模板安装。模板之间的缝隙紧密,保证不存在漏浆;当模板为木质材料时应在混凝土浇筑前洒水湿润,但禁止存水;浇筑混凝土前,清理模板,保证内部干净对于现浇的钢筋混凝土梁、板,如跨度≥4m时,模板要依据设计图纸规定进行起拱;当设计图纸并未对起拱有具体的要求时,依据施工规范规定起拱高度应为现浇的钢筋混凝土梁、板跨度的1/1000~3/1000。用水准仪或拉线、钢尺检查进行检验。
检查预埋件、预留孔洞的数量、位置和平面尺寸准确性,安装牢固性。检查数量:在相同检验批次,对梁、柱和独立基础,抽查构件数量的10%并且不能够小于3件;对墙和板,按有代表性的房间抽查10%同时满足数量大于等于3间;对大空间结构,墙体需要进行划分检查面,按照軸线间高度5m左右划分,板可按照纵、横轴线划分检查面,抽查10%。模板的拆除:在确保混凝土其表面完整和四周棱角不受损伤,才能进行侧模拆除。检查数量:全数检查。检验方法:观察法。在模板拆除工作时,避免对楼层形成冲击,支架、模板拆卸时,应当分开堆置并及时清理运输。检查数量:全数检查。检验方法:观察。
1.3主要质量关键点的控制。
柱模板容易产生的问题是:截面尺寸不详细不准确,混凝土保护层过厚,柱身出现扭曲。预防办法是:设置模板之前按图弹位置线,校正钢筋位置,支柱前柱子做好小方向盘模板,保证底部位置准确。根据柱子长度、宽度和高度,对柱箍尺寸及间距进行科学设计,柱子的四角应当做好支撑及拉杆。梁、板模板容易产生的问题是:梁底部出现不平整,梁侧面外鼓,上口尺寸出现大的偏差,板中部下挠。板预防方法:通过设计计算确定梁、板模板龙骨、支柱的尺寸及间距,以保证模板支撑系统具有满足要求的强度及刚度,在混凝土进行浇筑时防止模板变形。选取地质条件好的坚实地面作为模板支柱的支撑,预防支柱出现下沉,支柱下部应当垫长脚手板并贯通,为防止梁、板挠度过大,应当遵循有关设计要求对模板进行起拱。梁模板上口位置应当设置拉杆锁紧,防止上口变形。
墙模板容易产生的问题是:墙体混凝土厚度不能够保持统一,并且墙体截面尺寸存在误差。拼接不严,缝子过大出现跑浆现象。通过控制墙体高度、厚度作为模板设计根据,制定纵横龙骨的尺寸以及相互间距离,墙体的支撑方法,角模的形式。模板上口应该设置拉结,避免上口尺寸出现偏大问题。
2. 混凝土质量保证措施
(1)主控项目:水泥、细骨料、粗骨料、水和外加剂等要符合设计要求和施工规范的相关规定,为确保满足设计规定的质量要求,核查原材料的出厂合格证、进场复验试验报告;对预拌混凝土要检查其配合比单、现场搅拌土混凝土的配合比应委托具有资质的试验单位出具,现场原材料的计量、混凝土浇筑、混凝土养护要严格按施工规范规定进行;混凝土试块取样在浇筑现场随机抽取,要依据“混凝土强度试验评定标准”的相关要求进行制作、养护和试验;严禁设计文件中要求不允许出现裂缝的部位出现裂缝,设计文件中要求允许出现一定程度的裂缝的部位,出现的裂缝宽度严禁超过设计文件要求。
(2)一般项目:振捣密实,避免出现质量缺陷:如:蜂窝、麻面、孔洞、露筋等。
(3)允许偏差项目:允许偏差值表(MM)如表:
(4)主要质量关键点控制。
蜂窝,形成的缘由是混凝土进行下料时,分层浇筑厚度过厚,同时振捣工作没有达到要求出现振捣不实或漏振。水泥浆通过模板缝隙部位流失,钢筋比较密集而混凝土坍落度比较小或者石子过大,基础、柱墙根部甩槎处砂浆涌出等原因造成。露筋,钢筋垫块位移,间距过大,漏放,钢筋紧贴模板或梁底部振捣不实。麻面,模板表面粗糙光滑度不够,拆模时机不当,时间过早构件与混凝土没有完全脱离,导致表面混凝土粘附,形成脱皮。孔洞,在钢筋比较密集的位置混凝土被堵塞,在上层混凝浇筑之前没有进行振捣工作。缝隙及夹层,施工缝位置杂物没有清理干净或者是没有进行底浆浇筑。梁柱节点处断面出现尺寸偏差过大现象是由柱的接头模板存在刚度差。混凝土上表面标高不准,原因是抄平标记移动或未按标高抹平。轴线位移,螺栓孔洞预埋件出现位移主要由模板设置支撑牢靠,埋件稳固举措欠妥或浇筑混凝土和振捣时碰撞造成的。
参考文献
[1]张万祯,浅谈如何加强工业建筑和民用建筑的施工质量控制[J],科技情报开发与经济,2010,34.
【关键词】房屋建筑;模板施工;混凝土;质量保护
【Abstract】Scientific quality control system, to continuously improve the quality of the project, to meet customer quality requirements of the project played a pivotal role. Quality control system for smooth operation started their visibility, the establishment of enterprise quality management system has a significant impact. Quality control management in line with the sustainable development of strategic thinking, able to reflect the requirements of a harmonious society. Combined with my working practice, this paper talk about their views on the quality of protection from Formwork and concrete construction.
【Key words】Quality protection;Concrete;Formwork;Housing construction
近年来,随着房屋建筑需求量增大,房屋建筑工程建设迅速发展,施工质量问题越来越突出,最近时间频发的工程质量事故给房屋建筑工程敲响了警钟,必须加强房屋建筑工程质量控制,提升房屋建筑工程的质量。在房屋建筑的市场竞争中,质量越来越成为工程项目的标签,质量将成为占领市场份额的最有利武器。加强施工质量控制,提升工程项目质量首先熟悉施工质量控制的内容,这样才能够针对不同过程,对症下药,科学有效地控制施工质量。本文从模板施工与混凝土质量保护上谈谈自己的观点。
1. 模板施工质量保证措施
1.1主控项目。
模板的安装:当确保下层楼板具有一定承载力时,再进行上层模板及支架搭设工作。检查数量:全部进行检查。检验方法:依据模板设计文件和模板的施工技术方案。对模板刷隔离剂过程中,保证钢筋和混凝土接搓处干净。检查数量:全部进行检查。检验方法:操作中观察。模板的拆除:底层模板及其支架拆卸之前达到足够的强度;对于设计没有无具体要求时,保证混凝土强度相关的规定。检验方法:检查相同养护条件下试件强度的试验报告。
1.2一般项目。
模板的安装:按下列规定的要求进行模板安装。模板之间的缝隙紧密,保证不存在漏浆;当模板为木质材料时应在混凝土浇筑前洒水湿润,但禁止存水;浇筑混凝土前,清理模板,保证内部干净对于现浇的钢筋混凝土梁、板,如跨度≥4m时,模板要依据设计图纸规定进行起拱;当设计图纸并未对起拱有具体的要求时,依据施工规范规定起拱高度应为现浇的钢筋混凝土梁、板跨度的1/1000~3/1000。用水准仪或拉线、钢尺检查进行检验。
检查预埋件、预留孔洞的数量、位置和平面尺寸准确性,安装牢固性。检查数量:在相同检验批次,对梁、柱和独立基础,抽查构件数量的10%并且不能够小于3件;对墙和板,按有代表性的房间抽查10%同时满足数量大于等于3间;对大空间结构,墙体需要进行划分检查面,按照軸线间高度5m左右划分,板可按照纵、横轴线划分检查面,抽查10%。模板的拆除:在确保混凝土其表面完整和四周棱角不受损伤,才能进行侧模拆除。检查数量:全数检查。检验方法:观察法。在模板拆除工作时,避免对楼层形成冲击,支架、模板拆卸时,应当分开堆置并及时清理运输。检查数量:全数检查。检验方法:观察。
1.3主要质量关键点的控制。
柱模板容易产生的问题是:截面尺寸不详细不准确,混凝土保护层过厚,柱身出现扭曲。预防办法是:设置模板之前按图弹位置线,校正钢筋位置,支柱前柱子做好小方向盘模板,保证底部位置准确。根据柱子长度、宽度和高度,对柱箍尺寸及间距进行科学设计,柱子的四角应当做好支撑及拉杆。梁、板模板容易产生的问题是:梁底部出现不平整,梁侧面外鼓,上口尺寸出现大的偏差,板中部下挠。板预防方法:通过设计计算确定梁、板模板龙骨、支柱的尺寸及间距,以保证模板支撑系统具有满足要求的强度及刚度,在混凝土进行浇筑时防止模板变形。选取地质条件好的坚实地面作为模板支柱的支撑,预防支柱出现下沉,支柱下部应当垫长脚手板并贯通,为防止梁、板挠度过大,应当遵循有关设计要求对模板进行起拱。梁模板上口位置应当设置拉杆锁紧,防止上口变形。
墙模板容易产生的问题是:墙体混凝土厚度不能够保持统一,并且墙体截面尺寸存在误差。拼接不严,缝子过大出现跑浆现象。通过控制墙体高度、厚度作为模板设计根据,制定纵横龙骨的尺寸以及相互间距离,墙体的支撑方法,角模的形式。模板上口应该设置拉结,避免上口尺寸出现偏大问题。
2. 混凝土质量保证措施
(1)主控项目:水泥、细骨料、粗骨料、水和外加剂等要符合设计要求和施工规范的相关规定,为确保满足设计规定的质量要求,核查原材料的出厂合格证、进场复验试验报告;对预拌混凝土要检查其配合比单、现场搅拌土混凝土的配合比应委托具有资质的试验单位出具,现场原材料的计量、混凝土浇筑、混凝土养护要严格按施工规范规定进行;混凝土试块取样在浇筑现场随机抽取,要依据“混凝土强度试验评定标准”的相关要求进行制作、养护和试验;严禁设计文件中要求不允许出现裂缝的部位出现裂缝,设计文件中要求允许出现一定程度的裂缝的部位,出现的裂缝宽度严禁超过设计文件要求。
(2)一般项目:振捣密实,避免出现质量缺陷:如:蜂窝、麻面、孔洞、露筋等。
(3)允许偏差项目:允许偏差值表(MM)如表:
(4)主要质量关键点控制。
蜂窝,形成的缘由是混凝土进行下料时,分层浇筑厚度过厚,同时振捣工作没有达到要求出现振捣不实或漏振。水泥浆通过模板缝隙部位流失,钢筋比较密集而混凝土坍落度比较小或者石子过大,基础、柱墙根部甩槎处砂浆涌出等原因造成。露筋,钢筋垫块位移,间距过大,漏放,钢筋紧贴模板或梁底部振捣不实。麻面,模板表面粗糙光滑度不够,拆模时机不当,时间过早构件与混凝土没有完全脱离,导致表面混凝土粘附,形成脱皮。孔洞,在钢筋比较密集的位置混凝土被堵塞,在上层混凝浇筑之前没有进行振捣工作。缝隙及夹层,施工缝位置杂物没有清理干净或者是没有进行底浆浇筑。梁柱节点处断面出现尺寸偏差过大现象是由柱的接头模板存在刚度差。混凝土上表面标高不准,原因是抄平标记移动或未按标高抹平。轴线位移,螺栓孔洞预埋件出现位移主要由模板设置支撑牢靠,埋件稳固举措欠妥或浇筑混凝土和振捣时碰撞造成的。