天津粉末冶金厂南董分厂于1994年8月30日至9月2日在北京仙府饭店召开了铁粉订货会。会议期间,供需双方充分交换了意见。需方希望供方在稳定铁粉质量的基础上增加铁粉产量,保证按合同数量供应铁粉。供方向与会代表汇报了上年订货会议后,一年来厂方为稳定和提高铁粉质量所做的工作。并根据用户要求,1994年末将铁粉生产能力从2000t/年增加到3000t/年。
Nanning, Tianjin Powder Metallurgy Plant branch in August 30, 1994 to September 2 at the Xianfu Hotel Beijing held iron order. During the meeting, the two parties exchanged their opinions fully. The demand side hopes that the supplier will increase the output of iron powder on the basis of stabilizing the quality of iron powder and guarantee the supply of iron powder according to the contract amount. For the direction of the delegates to report after the previous year’s ordering meeting, the factory for a year to stabilize and improve the quality of iron work done. At the end of 1994, the capacity of iron powder production increased from 2000t / year to 3000t / year according to user’s request.