海排滑坡基本特征及对上江坝址枢纽工程的影响

来源 :资源环境与工程 | 被引量 : 0次 | 上传用户:sgb158518
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
上江坝址为金沙江中游替代虎跳峡高坝方案的比较坝址之一,海排滑坡位于上江坝址右坝肩,规模约2 600×104m3,为特大型岩质顺层滑坡,经稳定性分析该滑坡整体稳定性较好。上江坝址因受地形地质条件限制,枢纽建筑物多集中布置在右岸,其中大坝右岸坝体、溢洪道、1#、2#、3#导流隧洞进口边坡、上游围堰右岸堰体等建筑物直接涉及海排滑坡,主要存在坝(堰)基防渗处理、不均匀沉降变形、建筑物边坡稳定等工程地质问题,均须采取工程措施予以处理;引水发电隧洞和导流隧洞洞身段从海排滑坡滑床基岩中通过,洞室位于滑床以下30~347 m,滑坡对洞室稳定基本无影响。 The Shangjiang dam site is one of the comparative dam sites replacing the Hutiaoxia high dam project in the middle reaches of the Jinsha River. The Haimai landslide is located at the right abutment of the Shangjiang Dam site and has a scale of about 2600 × 104m3. It is a large- The overall stability of the landslide is good by stability analysis. Due to the topographic and geological conditions, the Jiangyan dam site is mainly located on the right bank. The right dam, the spillway, the inlet slope of diversion tunnels # 1, # 2 and # 3, the right bank of the upstream cofferdam Other structures directly involved in the seawall landslide, the main existence of dam (weir) base seepage treatment, uneven settlement deformation, slope stability and other engineering geological problems, must take engineering measures to be addressed; diversion tunnel and diversion tunnel The cave body passes through the bedrock of the Haidai landslide bedrock, and the cavern is located 30 to 347 m below the slip bed. The landslide has no effect on the stability of the cave house.
其他文献
2011年3月10日云南盈江发生5.8级地震,大盈江防护堤县城段的地震烈度为8度,造成大盈江堤防工程震损长达38.4km,经时区域地震地质、堤基地质条件和震损特征综合分析,认为大盈
近年来,湖北省石首市始终坚持严格执法、文明征收,在依法征收水资源费方面,进行了有益地探索。
期刊
入河排污口位于城镇排水系统的末端和水域的岸边,它所承载的问题,大多出现在岸上,它所带来的 后果,大多体现在水中.随着河长制的深入推进和河湖巡查监管工作的全面展开,入河
<正>根据十九大对社会经济的新提法和新判断,梳理热点词汇和出题方向,供考生参考。以时事热点为切入点的命题方式一直是公职类笔试和面试的主要命题方式之一,主要考查考生对
根据高精度层序地层高频沉积旋回、泥岩欠压实、有机地球化学特征,结合封闭条件和盐湖盆地地层发育差异性特征,将东濮凹陷古近系-第四系自上而下划分为5个成藏动力学系统,即顶部