论文部分内容阅读
龙滩水电站安装7台容量为700MW的水轮发电机组,本文主要论述了龙滩水电站700MW水轮机的水导轴承的结构、工作原理与安装工艺,并对其已安装和运行机组的水导轴承情况进行了总结。
This paper mainly discusses the structure, working principle and installation process of hydroturbine bearing of 700MW turbine of Longtan Hydropower Station. It also analyzes the condition of the hydrofoil bearing of installed and running units of Longtan Hydropower Station. Concluded.