论文部分内容阅读
结合实际,论述了大型低温液体贮罐设计中的罐体材料和绝热材料选择、结构设计以及焊接制造等方面的问题。简述了其投运前的总体检查及充液运行。
In combination with the actual situation, the problems of tank material and insulation material selection, structural design and welding manufacture in large cryogenic liquid storage tank design are discussed. Briefly introduced before the operation of the overall inspection and filling operation.