智能建筑工程的试运行时间

来源 :智能建筑 | 被引量 : 0次 | 上传用户:mn666666
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1智能建筑工程验收时试运行时间的执行情况试运行指建筑智能化系统安装、调试和自检完成后,系统按规定时间进行连续运行的过程。GB 50339-2003《智能建筑工程质量验收规范》(以下简称《规范》)中规定系统安装调试完成后,已进行规定时间的试运行后方可进行系统检测,而系统检测合格是竣工验收的前提,《规范》中规定的试运行时间按不同系统分别约定为一个月或三个月。 1 implementation of intelligent building project acceptance test run time Trial operation refers to the construction of intelligent system installation, commissioning and self-test is completed, the system according to the provisions of the continuous operation of the process. GB 50339-2003 “Intelligent Building Project Quality Acceptance Code” (hereinafter referred to as the “Code”) provides that after the completion of the system installation and commissioning, after a predetermined period of time before the trial operation of the system testing, and system testing is the precondition of completion acceptance, The “test” stipulated in the “Regulations” shall be agreed for one month or three months respectively according to different systems.
其他文献
本刊今年第9期刊登的《是“危害公共安全罪”还是“交通肇事罪”》一案,经云南省保山地区中级人民法院二审终审,以危害公共安全罪判处王黎斌有期徒刑15年。 原审法院保山市人民法
中冶集团华冶资源锡铁山二矿坚持安全生产,实施“固本强企,安全第一”的企业文化建设战略理念,指导企业和谐和创新发展,被青海省政府、省安全生产委员会授予“青海省安全生产
病历摘要患者男性,72岁。3年来经常感觉上腹部不适。1983年12月8日胃痛、腹胀厌食、纳差,自服活血丹疗效不显。12月10日后连续4天稀便,色黑红有粘液,每日2~3次,初量少,后量多
找到离你最近的ISP今年以来,我们收到了许多读者的来电来函,询问入网的一些问题和各地网络的建设情况,为此,我们这期为读者介绍了十个省市的经济信息网,它们虽是中经网的节点中心,可互
前不久,四川省渠县鲜渡乡金花村的龙品合,在县人大的帮助下终于官复原职,重新当上村主任。1996年1月,鲜渡乡金花村村委会换届选举,龙品合经该村村民依法选举,任该村村委会主任。同
图像格式GIF89a及在WWW上的应用。 Image Format GIF89a and Its Application on WWW.
《春秋》所记周天子、诸侯的殡期与《札记》所栽有不少不符之处,学者各有解说。细绎《春秋》经文,可以发现,春秋时期确实存在诸侯五月而葬的礼制,其执行虽因种种原因受到了破坏,但基本上是保存的。春秋晚期中原诸侯开始实行三月而葬的札制,与五月而葬并存。这可能与作为霸主的晋率先行用三月而葬有关。
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
急行车的急转弯每到冬天上海的交通就堵得慌,赶到上海近郊的桃浦染化八厂采访,一路上车子不是急煞车就是猛转弯,跌跌撞撞,真够累的。其实,我们的企业职工教育又何尝不是如此
收集者:钟诗颖收集地点:奶奶家的后院收集的瓜子:吊瓜子收集故事:我在奶奶家后院玩的时候,突然看见前面一个架子上铺满了绿油油的叶子,就像一个绿色的大帐篷。茂密的绿色叶子