论文部分内容阅读
一、小水电的发展历程和建设成就 水电站及其电网,是水资源综合利用的一个重要方面,是水利事业不可分割的组成部分,历来归口水电部门管理。 早在五十年代,各级政府设置的水利机构就附有水电建设与管理职能。1954年省成立水电厅时设有水电科。广东的水电建设就是在水利电力厅建制下开始的,小水电也是在水利工程建设的基础上发展起来的,大搞水库、陂坝引水、渠道跌水、电力排灌、水轮泵工程,为小水电的发展提供了有利条件。据怀集县统计:利用水轮泵站的拦河坝建
I. Development history and construction achievements of small hydropower Hydropower plants and their power grids are an important aspect of the comprehensive utilization of water resources and an integral part of the water conservancy business. They have traditionally been under the jurisdiction of the hydropower sector. As early as in the 1950s, water conservancy agencies set up by governments at all levels attached hydropower construction and management functions. In 1954, the Department of Hydroelectricity was established when the provincial hydropower agency was established. The construction of hydropower in Guangdong began under the establishment of the Department of Water Resources and Electric Power. Small hydropower was developed on the basis of the construction of water conservancy projects. The reservoirs and dams were diverted, the channels diverted, the power drainage and irrigation, and the water wheel pump projects were small. The development of hydropower provides favorable conditions. According to Huaiji County statistics: the use of waterwheel pumping stations to build dams