论文部分内容阅读
如图所示,在锥度套筒后边钻一通孔(孔应根据锥度套筒大小而定),装上顶杆1,并在顶杆上紧装入锥销2便可用了。
As shown in the figure, drill a through hole behind the taper sleeve (hole should be based on the taper sleeve size), install the mandrel 1, and fit the taper pin 2 onto the mandrel.