论文部分内容阅读
本文通过对钻孔灌注桩的整个过程的施工质量控制工作进行了分析,明确了钻孔灌注桩施工中应该重点注意的要点,通过做好钻孔灌注桩各个阶段的质量控制工作,使钻孔灌注桩在施工中容易出现的质量缺陷得以有效避免。
This paper analyzes the construction quality control of the whole process of bored piles and clarifies the key points that should be paid attention to in the construction of cast-in-place bored pile. Through the quality control of each stage of bored pile, the drilling Pouring pile prone to quality defects in the construction can be effectively avoided.