论文部分内容阅读
本文总结了通过海上拔桩试验的经验,得出一种简单可靠的拔桩方法,从而为平台的搬迁以及固定平台改造为活动平台,创造了有利的条件。
This paper summarizes the experience of pulling pile test at sea and concludes a simple and reliable method of pulling pile, which creates favorable conditions for the relocation of the platform and the transformation of the fixed platform into an active platform.