福建顺昌水泥厂是国家和福建省“七五”计划的重点工程。它利用澳大利亚资金,引进具有八十年代世界水平的技术设备,由国家建材工业局和福建省合资建设的大型建设项目。这个工厂的建设规模为年产六十二万吨水泥熟料,将引进一条日产2,000吨带预分解炉干法熟料生产线。工厂设置一条Φ3.95×56米带预分解炉的五级ILO悬浮预热窑,日产525号硅酸盐水泥熟料2,000吨、热耗为760千卡/公
Fujian Shunchang Cement Plant is a key project of the “Seventh Five-Year Plan” of the State and Fujian Province. It uses Australian funds to introduce world-class technical equipment in the 1980s and is a large-scale construction project jointly established by the State Building Materials Industry Bureau and Fujian Province. The construction scale of this plant is an annual output of 620,000 tons of cement clinker, and a 2,000 t/d dry clinker production line with a precalcining furnace will be introduced. The factory installed a Φ3.95×56m five-stage ILO suspension preheater with precalcining furnace. Nissan No. 525 portland cement clinker was 2,000 tons and heat consumption was 760 kcal/million.