论文部分内容阅读
中新社石家庄6月26日电石家庄轨道交通1号线一期、3号线一期首开段(以下简称“首开工程”)26日实现载客试运营,标志着河北省正式驶入“地铁”时代。石家庄成为京津冀地区第三个开通地铁的城市。石家庄地铁首开工程线路全长30.3 km,设车站25座,主要缓解石家庄市主城区东西向及火车站的交通需求。石家庄市轨道交通线网规划,由6条线组成“大放射,小方格”线网结构,线网总长241.7 km,共设车站160座。截至目前,石家庄市的轨道交通获批建设线路长度达80.4 km。
China news agency, Shijiazhuang, June 26 (Xinhua) Shijiazhuang Metro Line 1, Line 1, Line 3 first opening (hereinafter referred to as “the first project”) to achieve passenger carrying trial on the 26th, marking the official entry of Hebei Province “Metro ” era. Shijiazhuang become Beijing-Tianjin-Hebei region opened the third city subway. Shijiazhuang Metro first project line length of 30.3 km, set of 25 stations, mainly to ease the main city of Shijiazhuang east-west and the train station traffic demand. Shijiazhuang City rail transit network planning, composed of 6 lines “large radiation, small square ” line network structure, the total length of 241.7 km network, a total of 160 stations. Up to now, Shijiazhuang City approved the construction of rail transit lines up to 80.4 km.