1.计划内外物资调剂串换问题。由于种种原因,特别是在计划内外两种资源、两种价格并存的条件下,计划内物资品种不合用、不对路和到货不及时、不均衡的问题时有发生,为防止货到地头死和供应脱节,需要进行计划内外物资必要的串换。早在1986年国家计委、国家经委、财政部、人民银行、国家物资局5个部门的联合发文中,对此就有明确规定,必须继续坚持。计划内物资凡品种、规格和生产建设用项不对路的,不能如期供给用户的,运输流向不合理的和超储积压的,允许物资企业
1. Plan the exchange of material transfer within and outside the plan. Due to various reasons, especially under the condition that both resources inside and outside the plan and two kinds of prices coexist, the problems that the types of materials in the plan are not suitable for use, and the roads and arrivals are not timely or uneven are also happening from time to time. The disconnection from the supply requires the necessary replacement of the planned and external materials. As early as in 1986, the State Development Planning Commission, the State Economic Commission, the Ministry of Finance, the People’s Bank of China, and the State Bureau of Materials and Materials jointly issued articles that clearly stated that they must continue to be adhered to. If the types, specifications and production and construction items of the planned materials are not correct, if they cannot be supplied to users on schedule, if the transportation flow is unreasonable and the overstocked backlog exists, the materials enterprises may be allowed to