论文部分内容阅读
公路工程造价失控现象在全国普遍存在,对此已引起社会的广泛重视。公路测设是决定整个工程造价的最关键环节,探索、加强这个阶段的工作对控制工程造价具有极其重要的意义。引起工程造价失控的主要原因一、政策调价或编制办法修改是引起工程造价失控的重要原因。二、工程量的变更是引起工程造价失控的主要原因。从设计阶段看,使工程量产生变
The out-of-control of highway construction cost is widespread throughout the country, which has aroused widespread social attention. Highway measuring and determining is to determine the most critical part of the entire project cost, to explore and strengthen the work of this stage to control the project cost is extremely important. The main reason causing the project cost out of control One, the policy adjustment or preparation of the method is to change the project cost control is caused by an important reason. Second, the amount of engineering changes is the main reason for the project cost control. From the design stage, make the project volume change