论文部分内容阅读
探讨了装配块的构造和装配方案及防渗、排水体系,然后根据装配式重力坝的结构特点,建立了二维结构分析模型,并进行了实例计算
The construction and assembly scheme of the assembly block, as well as the seepage prevention and drainage system were discussed. Then, according to the structural characteristics of the assembled gravity dam, a two-dimensional structure analysis model was established and an example calculation was performed.