塔式起重机的安装和拆卸,首先要满足施工的要求,又要注意周围的环境条件,不能造成干涉、碰撞、触电和损害邻居利益的事,还要注意地形、地貌、土质情况,是否适合打基础和铺设轨道。安装塔机前,一定要仔细规划,事先要估计到可能发生的问题,不能等到装起来以后才发现问题,这样损失太大。安装和拆卸本身,又是安全要求很高的作业,要有专业技术人员指挥,切不可马虎从事,否则潜在的危险很大。一、对安装场地的要求(1)选择安装地点,应注意起重机的臂架端部活动范围与别的建筑物及建筑物外围施工设施之间的距离不得小于0.5m。
Tower crane installation and disassembly, the first to meet the construction requirements, but also pay attention to the surrounding environmental conditions, can not cause interference, collision, electric shock and damage the interests of neighbors things, but also pay attention to topography, topography, soil conditions, is suitable for playing Basic and laying track. Before installing tower crane, we must carefully plan, we must estimate in advance to the possible problems that can not be found until after installation, so that the loss is too large. Installation and demolition itself, but also a high security requirements of the operation, there must be professional and technical personnel command, must not be sloppy, otherwise the potential danger is great. First, the requirements of the installation site (1) Select the installation site, it should be noted that the boom crane boom range and other buildings and peripheral construction facilities should not be less than the distance between the construction of not less than 0.5m.