【摘 要】
:
李津身同志在“水力发电”提出装配式空心坝的问题我认为是今后改进重力坝的一个方向。不过本人对李同志所提出的单元构件及其砌筑法有一点意见。我认为单元构件(简称元件)
论文部分内容阅读
李津身同志在“水力发电”提出装配式空心坝的问题我认为是今后改进重力坝的一个方向。不过本人对李同志所提出的单元构件及其砌筑法有一点意见。我认为单元构件(简称元件)采用正方形,施工比较简单,这样元件本身在重力坝中可以满足应力及强度的要求,因为重力坝中混凝土强度应用很低,一般混凝土只作重量而行使其职权,而元件在制造中是工厂化的,所以
Comrade Li Jin-sheng proposed the problem of fabricated hollow dam in “hydroelectric power generation”. In my opinion, it is a direction for improving gravity dam in the future. However, I have a bit of opinion on the elements and masonry proposed by Comrade Li. In my opinion, the unit components (referred to as components) with a square, the construction is relatively simple, so that the component itself in the gravity dam can meet the requirements of stress and strength, because the gravity dam concrete application is very low, the general weight of concrete only exercise its powers, The components in the manufacture of the factory, so
其他文献
近日,英国顶级家具店THE CONRAN SHOP盛情登陆在上海展览中心开幕的第十五届TOP MARQUES上海国际奢华生活博览会。TOPMARQUES以汇聚众多奢侈品的“世界之最”而闻名全球,包括
一、基本情况 1.水土资源长江是我国最大的河流。从年总迳流量说,居世界大河流中的第四位;从水力蕴藏量说,居世界大河流中的第三位;从流域面积的大小说,则居世界大河流中的
在冰岛成功地“应力预测”了1次5级地震,做法是根据S波分裂的时间延迟变化来估计地震的时间和强度,即估计在受应力作用的体积(也是地震释放应变的体积)内微裂隙在应力作用下
淮阴地区水利局善后闸管理所管理三座中型挡潮闸,其中六孔烧香河闸是钢丝网水泥面板闸门,由于这里地处沿海,水质差、卤性高,虽有水泥沙浆作网筋保护层,但因防护层较薄,只有3
广西大容山水电厂3,000千瓦水轮发机是广东韶关水轮机厂产品,型号为TSW-133/105-4,是一种非标准机座的发电机,转速1,500转/分,电机电压6.3千伏,转子磁极极芯采用整体铸造。1
据美国《工程新闻记录》1978年4月6报道,美国哥伦比亚河上的大约瑟夫电站,位于大古里坝的下游,于五十年代初期建成。当时根据电力需要,在27台机组中只安装了16台,容量共102.
水工建筑物由于挡水结构的水头使水透到基础和河岸的土壤中,产生渗透压力。这种渗透压力对建筑物是不利的。它可以使基础底部受到冲刷,或发生管涌、流土和侵蚀,破坏基础;同
Ar/39Ar isotopic chronologic studies of intrusive rocks from Tongling area, Anhui province have shown that the ages of these rocks are all younger than 140 Ma a
在全面实施素质教育的今天,职业学校班主任的工作显得尤为重要,学生的素质状况,将直接反映社会主义精神文明的程度,将直接反映中等职业教育的质量,将直接反映一代新型劳动者
在水利工程建筑上采用灌浆工程还开始得不太久,那时主要是用於大型的建设工地中。随着苏联水利建设的广泛发展,灌浆工程的数量才逐年在增长着,其应用范围也才逐年在扩大着。