美国萨鲁达大坝的补救加固工程目前正在进行施工,目的在于提高大坝的抗震安全度。加固工程包括在紧挨现有大坝的下游修筑一个RCC和堆石戗台。为了确保开挖和加固施工过程中建筑物安全,实施了一项花费达600万美元的施工监测计划。
The remedial reinforcement project at the Saluda Dam in the United States is currently under construction with the aim of improving the seismic safety of the dam. Reinforcement involves the construction of a RCC and rockfill block downstream from the existing dam. To ensure the safety of buildings during excavation and reinforcement, a construction monitoring program costing up to $ 6 million was implemented.