论文部分内容阅读
苏联塔甘罗格的红色锅炉工工厂为ввзр-1000型核电站反应堆生产了新的热交换器,这种热交换设备的成本每套可降低160万卢布。这种新型热交换设备已在札波罗热核电站第一台机组上经过各种考验,受到了运行人员的高度评价。新的热交换设备更加完善,并能确保节省近200吨贵重材料。
The red boiler factory in the Soviet Union’s Taganrog produced a new heat exchanger for the ввзр-1000 nuclear reactor. The cost of the heat exchange equipment can be reduced by 1.6 million rubles per set. This new type of heat exchange equipment has undergone various tests on the first unit of the Zaporozhye nuclear power plant and has been highly evaluated by operating personnel. The new heat exchange equipment is more complete and it can ensure that nearly 200 tons of precious materials are saved.