论文部分内容阅读
东川日处理矿石100吨湿法冶金氨浸中间工厂,曾采用将矿浆中的矿粒按粗、细级别分开处理的办法,进行固液分离和洗涤回收。这样就形成了固液分离的流程复杂、设备繁多、动力消耗大、设备生产能力低,矿浆跑、冒、滴、漏损失严重,直接影响到氨浸中间工厂铜的实收率及氨耗指标。多次实
Dongchuan daily processing of 100 tons of hydrometallurgy ammonia leaching intermediate plant, used to mine the ore particles by coarse and fine separation of treatment methods for solid-liquid separation and washing recovery. This forms a solid-liquid separation process complicated, a large number of equipment, power consumption, equipment production capacity is low, pulp run, run, dripping, leakage loss serious, directly affect the ammonia leaching intermediate copper plant recovery rate and ammonia consumption indicators . Many times real