论文部分内容阅读
背景链接: 三峡电站的机电工程管理工作,面临着水轮发电机组单机容量世界上最大(70 万千瓦)、电站装机数量最多(26台)、技术要求高、国内装备制造能力相对较弱等困难。三峡建设者经过十多年的努力,2005 年9月15日实现了三峡左岸电站14台机组(980万千瓦)提前一年投产的佳绩,创造了多项水电建设的世界纪录。机电工程管理创新是三峡工程的亮点之一。
Background Link: The Three Gorges hydropower station’s mechanical and electrical engineering management is confronted with difficulties such as the maximum unit capacity of hydropower generating units in the world (700,000 kilowatts), the largest installed capacity of power stations (26 units), high technical requirements, and relatively weak domestic equipment manufacturing capabilities . After more than 10 years of hard work, the Three Gorges builders achieved success of 14 units (9.8 million kilowatts) put into operation a year earlier on September 15, 2005 and created a number of world records in hydropower construction. Mechanical and electrical engineering management innovation is one of the highlights of the Three Gorges Project.