论文部分内容阅读
介绍转体刚性索斜拉桥工程概况、工程进度及主要施工方法,安全生产、创优质工程的技术措施,以及主要工程数量与材料消耗。
This paper introduces the general situation of the project, the construction progress and main construction methods of the rigid body cable stayed bridge, the technical measures of safety production and high quality construction, as well as the quantity of major projects and material consumption.